Steve Dennis of American BathWorks was in charge of all the work except the shower door and counters. He and his crew, his son Morgan, and a friend Tobey, were able to get all the demolition done in a day.
In addition to taking out the vanity, tub, and shower, they needed to take the walls that would be tiled down to the studs, since special cement board would need to be installed. The same went for the floor. This also gave Steve access to all of the plumbing, since the tub and shower areas would need plumbing removed and new plumbing repositioned.